Construction Projects tabular form

The following projects are listed in an ascending order with the latest awarded project at the bottom of each category.

ABC Waters


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 ABC Waters Project at Hougang Town (Sg Pinang) 1160156 Quarter 1 - 2016 Quarter 2 - 2018 Low Hwee Yuen(86043831) 75%
2 ABC Waters Project at Hougang Town (Hougang Ave 10) 1160156 Quarter 1 - 2016 Quarter 2 - 2018 Low Hwee Yuen(86043831) 85%
3 ABC Waters Project at Hougang Town (Serangoon Reservoir) 1160156 Quarter 1 - 2016 Quarter 2 - 2018 Low Hwee Yuen(86043831) 80%
4 ABC Waters Project at Chestnut Drive Outlet Drain (Petir Road to Dairy Farm Crescent) 1170491 Quarter 4 - 2017 Quarter 2 - 2019 Ms Grace Lee(9044 8664) 5%
5 ABC Waters Project at Sungei Simpang Kanan 1180089 Quarter 1 - 2018 Quarter 4 - 2019 Pang Chin Siow(92964389) 1%

Drainage (Drainage Upgrading Programme)


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 Construction of Stamford Detention Tank 1140019 Quarter 4 - 2013 Quarter 2 - 2018 () 93%
2 Improvement to Kallang River (between Bishan Road and Braddell Road) 1150335 Quarter 3 - 2015 Quarter 4 - 2018 () 66%
3 Improvement to Bedok Canal Contract 1 (Between East Coast Parkway to the Sea) 1150406 Quarter 3 - 2015 Quarter 4 - 2018 () 56%
4 Construction of Stamford Diversion Canal Contract 2 (Grange Road) 1140510 Quarter 4 - 2014 Quarter 3 - 2018 () 82%
5 Improvement to Sungei Pandan Kechil (Ayer Rajah Expressway to West Coast Road) 1150173 Quarter 2 - 2015 Quarter 3 - 2018 () 79%
6 Improvement to Bukit Timah First Diversion Canal C3 (Between Holland Green & Clementi Road) 1150216 Quarter 2 - 2015 Quarter 4 - 2018 () 81%
7 Improvement to Bukit Timah First Diversion Canal C3 (Pine Grove to Clementi Road) 1150216 Quarter 2 - 2015 Quarter 4 - 2018 () 81%
8 Improvement to Tampines Canal (Between Upper Serangoon Road and Sungei Serangoon) 33140302 Quarter 2 - 2015 Quarter 3 - 2018 () 86%
9 Improvement to Roadside Drains V Contract W1 (Eng Kong Road/Eng Kong Place) 1150435 Quarter 1 - 2016 Quarter 2 - 2018 () 1%
10 Improvement to Roadside Drains V Contract W1 (Third Chin Bee Road and Chin Bee Drive) 1150435 Quarter 4 - 2015 Quarter 3 - 2018 () 96%
11 Improvement to Bedok Canal Contract 2 (Between Upper Changi Road East and Bedok Junction) 1150507 Quarter 4 - 2015 Quarter 1 - 2019 () 43%
12 Improvement to Roadside Drains V Contract E2 - Yishun Avenue 2/Yishun Ring Rd 1160047 Quarter 2 - 2016 Quarter 3 - 2018 () 77%
13 Improvement to Roadside Drains V Contract E2 - Jalan Tari Zapin (Phase 2) 1160047 Quarter 2 - 2016 Quarter 3 - 2018 () 1%
14 Improvement to Roadside Drains V Contract W2 (Pioneer Sector 1) 1160077 Quarter 1 - 2016 Quarter 4 - 2018 () 61%
15 Improvement to Roadside Drains V Contract W2 (Tanjong Penjuru/Penjuru Road) 1160077 Quarter 1 - 2016 Quarter 4 - 2018 () 79%
16 Improvement to Roadside Drains V Contract W2 (Jalan Sampurna) 1160077 Quarter 1 - 2016 Quarter 4 - 2018 () 90%
17 Improvement to Roadside Drains V Contract W2 (West Coast Road/Penjuru Road) 1160077 Quarter 1 - 2016 Quarter 4 - 2018 () 93%
18 Improvement to Roadside Drains V Contract E2 - Sembawang Road (SSC) 1160047 Quarter 2 - 2016 Quarter 3 - 2018 () 35%
19 Improvement to Roadside Drains V Contract E2 - Montreal Link 1160047 Quarter 2 - 2016 Quarter 3 - 2018 () 84%
20 Improvement to Roadside Drains V Contract C1 (Kingsmead Road) 1160105 Quarter 2 - 2017 Quarter 4 - 2018 () 91%
21 Improvement to Roadside Drains V Contract C1 - Synagogue St (opp OCBC Ctr) 1160105 Quarter 1 - 2016 Quarter 4 - 2018 () 78%
22 Improvement to Roadside Drains V Contract C1 (Bendemeer Road/Boon Keng Rd) 1160105 Quarter 1 - 2016 Quarter 4 - 2018 () 69%
23 Improvement to Sungei Pandan Kechil (between West Coast Road & the Sea) 1150546 Quarter 1 - 2016 Quarter 1 - 2019 () 70%
24 Improvement to Roadside Drains V Contract C1 (Mountbatten Road) 1160105 Quarter 1 - 2016 Quarter 4 - 2018 () 31%
25 Improvement to Roadside Drains V Contract C1 - Pan Island Expressway 22.5km near Eng Neo Ave 1160105 Quarter 1 - 2016 Quarter 4 - 2018 () 1%
26 Improvement to Roadside Drains V Contract C1 - Synagogue St (opp UOB Plaza) 1160105 Quarter 1 - 2016 Quarter 4 - 2018 () 78%
27 Improvement to Roadside Drains V Contract E3 (Seletar Hills West - Dedap Rd & Kasai Rd section) 1160261 Quarter 2 - 2016 Quarter 1 - 2019 () 95%
28 Improvement to Roadside Drains V Contract C2 (Lorong 22 to 44 Geylang Areas) 1160319 Quarter 3 - 2016 Quarter 1 - 2019 () 20%
29 Improvement to Roadside Drains V Contract W1 - International Road,near 2nd Lok Yang Road 1150435 Quarter 4 - 2015 Quarter 3 - 2018 () 33%
30 Improvement to Roadside Drains V Contract W3 (Bukit Timah Rd, Eastern Section) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 6%
31 Improvement to Roadside Drains V Contract W3 (Bukit Timah Rd, Western Section) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 6%
32 Improvement to Roadside Drains V Contract W3 - Gul Crescent/ Pioneer Road 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
33 Improvement to Roadside Drains V Contract W3 (Dover Ave/Commonwealth Ave West) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 95%
34 Improvement to Roadside Drains V Contract W3 (Pioneer Sector 1 and 2) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
35 Improvement to Roadside Drains V Contract W3 (Sunset Way) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 52%
36 Improvement to Roadside Drains V Contract W3 (Pioneer Road North) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
37 Improvement to Roadside Drains V Contract W3 (International Road/Neythal Road) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
38 Improvement to Roadside Drains V Contract W3 (Jalan Pelepah) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 67%
39 Improvement to Roadside Drains V Contract W3 (South Bouna Vista Rd & Pasir Panjang Rd,Southern Secto... 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
40 Improvement to Roadside Drains V Contract W3 (Pasir Panjang Rd) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
41 Improvement to Roadside Drains V Contract W3 (Pioneer Sector 2) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
42 Improvement to Roadside Drains V Contract W3 (South Bouna Vista Rd & Pasir Panjang Rd, Northern Sect... 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
43 Improvement to Roadside Drains V Contract W3 (Pasir Panjang Hill) 1160601 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
44 Improvement to Roadside Drains V Contract C3 (Jervois Lane) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 6%
45 Improvement to Roadside Drains V Contract E4 (Yishun Ave 2 Sump) 1170106 Quarter 1 - 2017 Quarter 1 - 2020 () 1%
46 Improvement to Roadside Drains V Contract E4 (Upper Serangoon Rd) 1170106 Quarter 1 - 2017 Quarter 1 - 2020 () 29%
47 Improvement to Roadside Drains V Contract C3 (Broadrick Outlet Drain) 1170100 Quarter 3 - 2017 Quarter 1 - 2019 () 1%
48 Improvement to Roadside Drains V Contract C3 (Yio Chu Kang Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 45%
49 Improvement to Roadside Drains V Contract C3 (King's Road/King's Close) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 20%
50 Improvement to Roadside Drains V Contract C3 - Merryn Rd Outlet Drain Eastern Sector 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
51 Improvement to Roadside Drains V Contract C3 - Merryn Rd Outlet Drain Western Sector 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
52 Improvement to Roadside Drains V Contract C3 (Tiong Bahru Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
53 Improvement to Roadside Drains V Contract C3 (Coronation Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
54 Improvement to Roadside Drains V Contract C3 (Kampong Arang Rd) 1170100 Quarter 1 - 2017 Quarter 1 - 2019 () 61%
55 Improvement to Roadside Drains V Contract C3 (Neil Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 1%
56 Improvement to Roadside Drains V Contract C3 (Clemenceau Ave North/Peck Hay Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 72%
57 Improvement to Roadside Drains V Contract C3 (Potong Pasir Ave 1, 2 & 3) 1170100 Quarter 2 - 2017 Quarter 3 - 2019 () 90%
58 Improvement to Roadside Drains V Contract E4 - Pan Island Expressway (near slip road to Tampines Ave... 1170106 Quarter 1 - 2017 Quarter 1 - 2020 () 1%
59 Improvement to Roadside Drains V Contract E4 - Kasai Road & Neram Road (Seletar Hill West Estate) 1170106 Quarter 1 - 2017 Quarter 1 - 2020 () 26%
60 Improvement to Roadside Drains V Contract W4 (Service Road along Dunearn Road/Jln Jambu Ayer) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 65%
61 Improvement to Roadside Drains V Contract W4 (Buroh Dr) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 87%
62 Improvement to Roadside Drains V Contract W4 (Pioneer Road/Gul Lane) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 1%
63 Improvement to Roadside Drains V Contract W4 (Fishery Port/Jln Tepong 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 1%
64 Improvement to Roadside Drains V Contract W4 (Penjuru Lane & Penjuru Rd) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 1%
65 Improvement to Roadside Drains V Contract W4 (Lok Yang Way/Pioneer Road North) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 54%
66 Improvement to Roadside Drains V Contract W4 (Boon Lay Way) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 8%
67 Improvement to Roadside Drains V Contract W4 (Gul Road) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 1%
68 Improvement to Roadside Drains V Contract W4 (Yew Siang Rd) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 1%
69 Improvement to Roadside Drains V Contract W4 (Siok Wan Cl) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 1%
70 Improvement to Roadside Drains V Contract W1 (Tuas West Road) 1150435 Quarter 4 - 2015 Quarter 3 - 2018 () 97%
71 New Drainage Infrastructure at Marina South 33160325 Quarter 4 - 2017 Quarter 4 - 2020 () 1%
72 Improvement to Roadside Drains V Contract E2 - Telok Kurau Lor N (Near Still Road) 1160047 Quarter 2 - 2016 Quarter 3 - 2018 () 87%
73 Improvement to Roadside Drains V Contract E5 (Pasir Ris Outlet Drain) 1180028 Quarter 1 - 2018 Quarter 1 - 2021 () 1%
74 Improvement to Roadside Drains V Contract E5 (Jln Kembangan) 1180028 Quarter 1 - 2020 Quarter 1 - 2021 () 1%
75 Improvement to Roadside Drains V Contract E5 (Yishun Ave 1/ Yishun Ave 6) 1180028 Quarter 1 - 2018 Quarter 1 - 2021 () 1%
76 Improvement to Roadside Drains V Contract E5 (Pasir Ris Estate) 1180028 Quarter 1 - 2018 Quarter 1 - 2021 () 1%
77 Improvement to Roadside Drains V Contract E5 (Hai Sing Estate) 1180028 Quarter 1 - 2018 Quarter 1 - 2021 () 1%
78 Improvement to Roadside Drains V Contract C4 - Kampong Ampat 1180182 Quarter 2 - 2018 Quarter 2 - 2021 () 1%
79 Improvement to Roadside Drains V Contract C4 - Langsat Rd/Lr Changi 1180182 Quarter 2 - 2018 Quarter 2 - 2021 () 1%
80 Improvement to Roadside Drains V Contract C4 - Sennett Estate 1180182 Quarter 2 - 2018 Quarter 2 - 2021 () 1%
81 Improvement to Roadside Drains V Contract C4 - Thomson Rd 1180182 Quarter 2 - 2018 Quarter 2 - 2021 () 1%
82 Improvement to Alexandra Canal Subsidiary Drain "A" (Between Alexandra Road and Alexandra Canal) 1180191 Quarter 2 - 2018 Quarter 4 - 2020 () 1%
83 Improvement to Sungei Tampines (Tampines Ave 7 to Tampines Expressway) 1180229 Quarter 2 - 2018 Quarter 2 - 2021 () 1%

Drainage (in conjunction with Estate upgrading programme by MND)


No record found...

Sewerage (new sewer and sewer rehabilitation)


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 Proposed Sewers in Geylang, Jalan Wangi, Woodlands Industrial Park E1 and Collyer Quay Areas (Guill... 1130542 Quarter 4 - 2013 Quarter 3 - 2016 Kimmy Tan(97112912) 96%
2 Proposed Sewers in Geylang, Jalan Wangi, Woodlands Industrial Park E1 and Collyer Quay Areas (Collye... 1130542 Quarter 4 - 2013 Quarter 2 - 2017 Kimmy Tan(97112912) 96%
3 Proposed Sewers in Tagore Drive (Contract 2) 1140239 Quarter 2 - 2014 Quarter 1 - 2017 () 91%
4 Proposed Sewers in Bedok Reservoir and Changi Business Park Areas 1140355 Quarter 3 - 2014 Quarter 3 - 2018 () 83%
5 Proposed Sewers in Kranji Area 1140314 Quarter 3 - 2014 Quarter 1 - 2017 () 98%
6 Proposed Sewers in Marina Central Area - Contract 1 1140327 Quarter 3 - 2014 Quarter 2 - 2018 () 59%
7 Proposed Sewers in Mandai Road Area 1140436 Quarter 3 - 2014 Quarter 4 - 2018 () 76%
8 Proposed Sewers in Yishun Avenue 7 Area 1140547 Quarter 4 - 2014 Quarter 2 - 2018 () 67%
9 Proposed Sewers In Sembawang Road and Sembawang Avenue Areas 1140613 Quarter 4 - 2014 Quarter 4 - 2018 Ms Aderline Tay(90920156) 49%
10 Proposed Sewer in Cairnhill and Newton Circus Areas 1150138 Quarter 1 - 2015 Quarter 4 - 2017 Ms Sharon(96773788) 80%
11 Proposed Sewers in Ang Mo Kio Avenue 5 Area 1140483 Quarter 3 - 2014 Quarter 2 - 2017 () 74%
12 Proposed Sewers in Clementi Avenue 4 and Clementi Avenue 6 Areas 1150137 Quarter 2 - 2015 Quarter 3 - 2018 () 80%
13 Proposed Sewers in Clementi Avenue 4 and Clementi Avenue 6 Areas 1150137 Quarter 2 - 2015 Quarter 3 - 2018 () 80%
14 Sewerage Scheme to serve Marina South Area - Contract 2B (along Union Street) 1130074 Quarter 1 - 2013 Quarter 1 - 2017 () 55%
15 Sewerage Scheme to serve Marina South Area - Contract 2B (along Marina Coastal Expressway) 1130074 Quarter 1 - 2013 Quarter 1 - 2017 () 55%
16 Proposed Sewers in Changi East Area - Package A Contract 1 (Balance Works) 1160358 Quarter 3 - 2016 Quarter 3 - 2018 () 36%
17 Proposed Sewers in St. Michael's Road, St. Francis Road, Leonie Hill Road & River Valley Road Areas ... 1150329 Quarter 3 - 2015 Quarter 1 - 2019 Long Philip Andrew(94361027) 70%
18 Proposed Sewers in St. Michael's Road, St. Francis Road, Leonie Hill Road & River Valley Road Areas ... 1150329 Quarter 3 - 2015 Quarter 1 - 2019 Long Philip Andrew(94361027) 70%
19 Proposed Sewers in St. Michael's Road, St. Francis Road, Leonie Hill Road & River Valley Road Areas ... 1150329 Quarter 3 - 2015 Quarter 1 - 2019 Long Philip Andrew(94361027) 70%
20 Proposed Sewers in Lorong Lada Hitam Area - Contract 1 1140583 Quarter 4 - 2014 Quarter 1 - 2017 Jude Muraleetharan(91298037) 91%
21 Proposed Sewers in Tuas Ave 2 & 10 Areas 1140599 Quarter 1 - 2015 Quarter 3 - 2017 Fred(98627988) 84%
22 JLDL1 - Rehabilitation of Sanitary Drain-lines in Jurong Lake Catchment 1150368 Quarter 3 - 2015 Quarter 3 - 2017 Vincent(96698158) 5%
23 Proposed Sewers in Sungei Tengah Agrotechnology Park Area (Package A) 1160224 Quarter 2 - 2016 Quarter 1 - 2019 () 48%
24 Proposed Sewers in Sungei Tengah Agrotechnology Park Area (Package A) 1160224 Quarter 1 - 2016 Quarter 1 - 2019 () 49%
25 Proposed Sewers in Lorong Chuan and Lim Tua Tow Areas 1160206 Quarter 2 - 2016 Quarter 1 - 2019 Kimmy Tan Kim Guat(97112912) 56%
26 Proposed Sewers in Lorong Chuan and Lim Tua Tow Areas 1160206 Quarter 2 - 2016 Quarter 1 - 2019 Kimmy Tan Kim Guat(97112912) 56%
27 Rehabilitation of Sanitary Drain-lines - Jurong Lake Catchment Contract 2 (JL2) 1160140 Quarter 2 - 2016 Quarter 2 - 2018 Rachel(31091233) 67%
28 Proposed Sewers in Upper Changi Road East Area - Contract 1 1160323 Quarter 3 - 2016 Quarter 3 - 2019 Elaine Tan Yee Li(83233938) 35%
29 Proposed Sewers in Upper Changi Road East Area - Contract 1 1160323 Quarter 3 - 2016 Quarter 3 - 2019 Elaine Tan Yee Li(83233938) 35%
30 Proposed Sewers in Cuppage Road and Koek Road Areas 1160339 Quarter 3 - 2016 Quarter 4 - 2018 () 68%
31 Sewerage Scheme to Serve Jurong Eastern Catchment (Package D) - Demolition of Pumping Stations 1160245 Quarter 2 - 2016 Quarter 3 - 2018 Nirmaladevi.V(Devi)(95970428) 43%
32 Sewerage Scheme to Serve Jurong Eastern Catchment (Package D) - Demolition of Pumping Stations 1160245 Quarter 2 - 2016 Quarter 3 - 2018 Nirmaladevi.V(Devi)(95970428) 43%
33 Proposed Sewers in Bukit Batok East Ave 3 Area 1160293 Quarter 3 - 2016 Quarter 1 - 2019 () 44%
34 Proposed Sewers in North Woodlands Area (Package A) - Contract 1 1160257 Quarter 2 - 2016 Quarter 3 - 2019 Noor Mohmmed Bin Yusoff Ali(91415768) 37%
35 Proposed Sewers in North Woodlands Area (Package B) – Contract 1 1160247 Quarter 2 - 2016 Quarter 3 - 2019 Long Philip Andrew(94361027) 53%
36 (WC1) Rehabilitation of Sewerage Network Phase 4 – Western Central Area Contract 1 1160439 Quarter 3 - 2016 Quarter 2 - 2018 Felicia Ng(87970918) 38%
37 (WC2) Rehabilitation of Sewerage Network Phase 4 – Western Central Area Contract 2 1160431 Quarter 3 - 2016 Quarter 3 - 2018 Mark Lee(98756271) 39%
38 (WC3) Rehabilitation of Sewerage Network Phase 4 – Western Central Area Contract 3 1160457 Quarter 3 - 2016 Quarter 3 - 2018 Max(82994817) 28%
39 Proposed Sewers In Toh Tuck Avenue Area 1170110 Quarter 1 - 2017 Quarter 4 - 2019 Ms Truya Marijoy Millones(82579355) 8%
40 PROPOSED SEWERS IN LIM CHU KANG AREA - CONTRACT 1 1170224 Quarter 2 - 2017 Quarter 1 - 2020 () 24%
41 Sewerage Scheme to Serve Marina South Area – Contract 2D 1170212 Quarter 2 - 2017 Quarter 3 - 2018 () 27%
42 Proposed Sewers in Sungei Tengah Agrotechnology Park Area (Package B) 1170002 Quarter 1 - 2017 Quarter 4 - 2019 Tay Ern Chai(92452704) 4%
43 PROPOSED SEWERS IN SUNGEI TENGAH AGROTECHNOLOGY PARK AREA (PACKAGE C) 1170231 Quarter 1 - 2017 Quarter 1 - 2020 () 11%
44 Proposed Sewers in Lim Chu Kang Area - Contract 2 1170393 Quarter 3 - 2017 Quarter 2 - 2020 Ms Hanul(8100 0751) 13%
45 Sewerage Scheme to Serve Marina South Area – Contract 2 (Balance Works) 1170312 Quarter 2 - 2017 Quarter 1 - 2019 () 14%
46 Sewerage Scheme to Serve Marina South Area – Contract 2 (Balance Works) 1170312 Quarter 2 - 2017 Quarter 1 - 2019 () 14%
47 Proposed Sewers in New Loyang Link And Tanah Merah Besar Road Areas 1170374 Quarter 3 - 2017 Quarter 1 - 2020 Quek Er Kee() 8%
48 Rehabilitation of Sanitary Drain-lines - Jurong Lake Catchment Contract 3 (JL3) 1170184 Quarter 2 - 2017 Quarter 2 - 2019 Irma(81113780) 13%
49 PROPOSED SEWERS IN EBER ROAD, PATERSON HILL AND PASIR 1170280 Quarter 2 - 2017 Quarter 1 - 2020 Sharon Kaur(9677 3788) 11%
50 PROPOSED SEWERS IN EBER ROAD, PATERSON HILL AND PASIR 1170280 Quarter 2 - 2017 Quarter 1 - 2020 Sharon Kaur(9677 3788) 11%
51 PROPOSED SEWERS IN EBER ROAD, PATERSON HILL AND PASIR 1170280 Quarter 2 - 2017 Quarter 1 - 2020 Sharon Kaur(9677 3788) 11%
52 SEWERAGE SCHEME TO SERVE PULAU PUNGGOL BARAT CONTRACT 1 – PROPOSED SEWERS AND PUMPING MAINS ALONG SE... 1170516 Quarter 4 - 2017 Quarter 1 - 2020 () 1%
53 Proposed Sewers In Ulu Pandan ,Pandan Valley And Mount Sinai Rise Areas (Pandan Valley And Mount Sin... 1170479 Quarter 4 - 2017 Quarter 3 - 2020 Mary Rose Totto() 0%
54 Proposed Sewers In Ulu Pandan ,Pandan Valley And Mount Sinai Rise Areas (Ulu Pandan) 1170479 Quarter 4 - 2017 Quarter 3 - 2020 Mary Rose Totto() 0%
55 PROPOSED SEWERS IN BUANGKOK GREEN AND SENGKANG EAST AREAS 1170518 Quarter 4 - 2017 Quarter 1 - 2021 () 1%
56 Proposed Sewers in Lim Chu Kang Area – Contract 3 1170560 Quarter 4 - 2017 Quarter 3 - 2020 Lee Wen Ting(93397617) 2%
57 Proposed Sewers in Stevens Road and Merpati Road Areas (Stevens Road) 1180011 Quarter 4 - 2017 Quarter 1 - 2021 Ms Kimmy Tan() 0%
58 Proposed Sewers in Stevens Road and Merpati Road Areas (Merpati Road) 1180011 Quarter 4 - 2017 Quarter 1 - 2021 Ms Kimmy Tan() 0%
59 Demolition of Nee Soon Pumping Station 1170517 Quarter 4 - 2017 Quarter 1 - 2019 Mr Yong Seow Wai() 9%
60 Proposed Sewers in Lim Chu Kang Area – Contract 4 1880065 Quarter 2 - 2018 Quarter 4 - 2020 Ivy Goh(97337155) 0%
61 TC4 - Term Contract for Rehabilitation, Repair and Replacement of Sewerage Systems in Various Catchments 1170315 Quarter 2 - 2017 Quarter 2 - 2019 Chris(92985830) 20%
62 P5NRC1 - Rehabilitation of Sewerage Network Phase 5 – Northern Region Contract 1 1170453 Quarter 3 - 2017 Quarter 4 - 2019 Joey Keuek Chin Yee(83282588) 5%
63 P5ERCCTV - Rehabilitation of Sewerage Network Phase 5 Colour Closed-Circuit Television (CCTV) Survey... 1170445 Quarter 3 - 2017 Quarter 3 - 2018 Sinnathamby Sarasvathy(85970988) 10%
64 P5NRC2 - Rehabilitation of Sewerage Network Phase 5 – Northern Region Contract 2 1170466 Quarter 3 - 2017 Quarter 4 - 2019 Lim Lee Noi Lilian(98420643) 5%
65 Proposed Sewers in Upper Changi Road East Area – Contract 2 1170230 Quarter 2 - 2017 Quarter 3 - 2020 Nisa Razak(98246167) 8%
66 Proposed Sewers in Upper Changi Road East Area – Contract 2 1170230 Quarter 2 - 2017 Quarter 3 - 2020 Nisa Razak(98246167) 8%
67 Proposed Sewers in Upper Changi Road East Area – Contract 2 1170230 Quarter 2 - 2017 Quarter 3 - 2020 Nisa Razak(98246167) 8%
68 Proposed Sewers in Punggol Road and Sengkang East Areas – Contract 1 (Sengkang East Area) 1180129 Quarter 1 - 2018 Quarter 2 - 2021 Ms Ong Sher Ting, Jace(92308169) 0%
69 Proposed Sewers in Punggol Road and Sengkang East Areas – Contract 1 (Punggol Road Area) 1180129 Quarter 1 - 2018 Quarter 2 - 2021 Ms Ong Sher Ting, Jace(92308169) 0%
70 SEWERAGE SCHEME TO SERVE PULAU PUNGGOL BARAT CONTRACT 2 - PROPOSED PUMPING MAINS ALONG SELETAR NORTH... 1180186 Quarter 2 - 2018 Quarter 3 - 2020 () 0%

Water Supply (NEWater, potable water)


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 NIPE Contract C1 - Jurong Island Highway from Sakra Road to Banyan Ave... 1100222 Quarter 2 - 2010 Quarter 3 - 2014 () 93%
2 NIPE Contract C2 - Banyan Avenue to Pesek Road & along Tembusu Ave to Jurong Island Highway... 1100216 Quarter 2 - 2010 Quarter 3 - 2014 () 98%
3 SUPPLY, LAYING AND INSTALLATION OF 1600MM / 1200MM DIAMETER POTABLE WATER PIPELINE ALONG ANG MO KIO ... 1150175 Quarter 3 - 2015 Quarter 4 - 2018 () 82%
4 LAYING OF 1600MM DIAMETER POTABLE WATER PIPELINE FROM PUNGGOL WAY TO ELIAS ROAD 1150235 Quarter 3 - 2015 Quarter 3 - 2017 () 83%
5 Proposed 2200mm diameter pipeline from PIE/Rifle Range Road to Tanglin Halt Road 1160148 Quarter 2 - 2016 Quarter 3 - 2018 Tee Wee Lee(88180561) 50%
6 Laying of Watermains in Tampines North and Punggol Way... 1150387 Quarter 4 - 2015 Quarter 4 - 2018 () 50%
7 SUPPLY AND LAYING OF 1600MM DIAMETER WATER PIPELINE ALONG LORONG CHUAN AND BOUNDARY ROAD 1150239 Quarter 2 - 2015 Quarter 2 - 2017 Noorie Yasmin(83383974) 10%
8 Proposed 2200mm Diameter Pipeline from Tanglin Halt Road to AYE/Henderson Road 1160274 Quarter 2 - 2016 Quarter 3 - 2018 Ms Serena Tang(98330407) 75%
9 Proposed Twin 1600mm Diameter Pipeline from AYE/Henderson Road to Keppel Road and 1600mm Diameter Pi... 1160279 Quarter 2 - 2016 Quarter 3 - 2019 Mr. Alan Tan(91191183) 20%
10 Laying of 1600mm Diameter Pipeline from AYE/Henderson Road to River Valley Road... 1160263 Quarter 3 - 2016 Quarter 3 - 2019 Shoban Raj(97716896) 20%
11 Proposed 2200mm diameter pipeline from Murnane Service Reservoir (MNSR) at Jalan Kampong Chantek to ... 1160396 Quarter 3 - 2016 Quarter 2 - 2019 S R Divina(98702664) 13%
12 Proposed 800mm diameter pipelines from Pioneer Road to Tuas South Avenue 5 and along Tuas South Boul... 1160330 Quarter 4 - 2016 Quarter 3 - 2019 Shane Shi(96546461) 33%
13 Supply and Laying of 1200mm Diameter Water Pipeline along Clementi Road and West Coast Highway 1160514 Quarter 1 - 2017 Quarter 3 - 2018 Kam Meng Swee(97667343) 34%
14 Proposed 900 dia. potable water pipelines along proposed realigned Punggol Road and two future roads... 1160132 Quarter 4 - 2017 Quarter 1 - 2018 Keith(91847013) 90%
15 www... 1160199 Quarter 2 - 2016 Quarter 1 - 2018 () 90%
16 Supply and Laying of 900mm/1200mm/1400mm dia Water Pipelines in Bukit Kalang Service Reservoir 1170096 Quarter 1 - 2017 Quarter 3 - 2018 () 6%
17 Laying of 1600/1200mm dia PW Pipeline along Elias Road and Tampines Ave 6 1170310 Quarter 3 - 2017 Quarter 3 - 2019 () 1%
18 Supply, Laying and Installation of 1600/800mm Dai Potable Water Pipelines in Marina South 1170515 Quarter 2 - 2018 Quarter 4 - 2019 () 2%
19 NIL... 1150013 Quarter 2 - 2015 Quarter 3 - 2018 Alan Tan(91191183) 99%
20 NIL... 1160412 Quarter 3 - 2016 Quarter 3 - 2018 Jack Wong(90033605) 5%