Construction Projects tabular form

The following projects are listed in an ascending order with the latest awarded project at the bottom of each category.

ABC Waters


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 ABC Waters Project at Chestnut Drive Outlet Drain (Petir Road to Dairy Farm Crescent) 1170491 Quarter 4 - 2017 Quarter 2 - 2019 Ms Grace Lee(9044 8664) 100%
2 ABC Waters Project at Sungei Simpang Kanan 1180089 Quarter 1 - 2018 Quarter 4 - 2019 Pang Chin Siow(92964389) 80%
3 ABC Waters Project at Bukit Batok West Outlet Drain and Sungei Whampoa 1180172 Quarter 3 - 2018 Quarter 4 - 2019 Jack Leow(96305930) 75%
4 ABC Waters Project at Sungei Ulu Pandan (Clementi Avenue 4 to Sungei Pandan) 1190226 Quarter 3 - 2019 Quarter 4 - 2021 Ms Jing Fen(87558098) 1%

Drainage (Drainage Upgrading Programme)


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 Improvement to Kallang River (between Bishan Road and Braddell Road) 1150335 Quarter 3 - 2015 Quarter 3 - 2019 () 100%
2 Improvement to Bedok Canal Contract 1 (Between East Coast Parkway to the Sea) 1150406 Quarter 3 - 2015 Quarter 4 - 2019 () 98%
3 Improvement to Bedok Canal Contract 2 (Between Upper Changi Road East and Bedok Junction) 1150507 Quarter 4 - 2015 Quarter 2 - 2020 () 65%
4 Improvement to Sungei Pandan Kechil (between West Coast Road & the Sea) 1150546 Quarter 1 - 2016 Quarter 3 - 2019 () 100%
5 Improvement to Roadside Drains V Contract W3 (Bukit Timah Rd, Eastern Section) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 100%
6 Improvement to Roadside Drains V Contract W3 (Bukit Timah Rd, Western Section) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 100%
7 Improvement to Roadside Drains V Contract W3 - Gul Crescent/ Pioneer Road 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 1%
8 Improvement to Roadside Drains V Contract W3 (Dover Ave/Commonwealth Ave West) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 100%
9 Improvement to Roadside Drains V Contract W3 (Pioneer Sector 1 and 2) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 52%
10 Improvement to Roadside Drains V Contract W3 (Sunset Way) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 85%
11 Improvement to Roadside Drains V Contract W3 (Pioneer Road North) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 68%
12 Improvement to Roadside Drains V Contract W3 (International Road/Neythal Road) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 68%
13 Improvement to Roadside Drains V Contract W3 (Jalan Pelepah) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 100%
14 Improvement to Roadside Drains V Contract W3 (South Bouna Vista Rd & Pasir Panjang Rd,Southern Secto... 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 83%
15 Improvement to Roadside Drains V Contract W3 (Pasir Panjang Rd) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 85%
16 Improvement to Roadside Drains V Contract W3 (Pioneer Sector 2) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 52%
17 Improvement to Roadside Drains V Contract W3 (South Bouna Vista Rd & Pasir Panjang Rd, Northern Sect... 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 83%
18 Improvement to Roadside Drains V Contract W3 (Pasir Panjang Hill) 1160601 Quarter 1 - 2017 Quarter 4 - 2019 () 83%
19 Improvement to Roadside Drains V Contract C3 (Jervois Lane) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 100%
20 Improvement to Roadside Drains V Contract E4 (Upper Serangoon Rd) 1170106 Quarter 1 - 2017 Quarter 1 - 2020 () 79%
21 Improvement to Roadside Drains V Contract C3 (Broadrick Outlet Drain) 1170100 Quarter 3 - 2017 Quarter 3 - 2019 () 88%
22 Improvement to Roadside Drains V Contract C3 (Yio Chu Kang Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 100%
23 Improvement to Roadside Drains V Contract C3 (King's Road/King's Close) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 100%
24 Drainage works at Kheam Hock Road 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 100%
25 Drainage works at Merryn Rd Outlet Drain 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 100%
26 Improvement to Roadside Drains V Contract C3 (Tiong Bahru Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 66%
27 Improvement to Roadside Drains V Contract C3 (Coronation Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 100%
28 Improvement to Roadside Drains V Contract C3 (Kampong Arang Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 100%
29 Improvement to Roadside Drains V Contract C3 (Neil Rd) 1170100 Quarter 1 - 2017 Quarter 3 - 2019 () 100%
30 Improvement to Roadside Drains V Contract C3 (Potong Pasir Ave 1, 2 & 3) 1170100 Quarter 2 - 2017 Quarter 3 - 2019 () 96%
31 Improvement to Roadside Drains V Contract E4 - Pan Island Expressway (near slip road to Tampines Ave... 1170106 Quarter 1 - 2017 Quarter 1 - 2020 () 70%
32 Improvement to Roadside Drains V Contract E4 - Kasai Road & Neram Road (Seletar Hill West Estate) 1170106 Quarter 1 - 2017 Quarter 1 - 2020 () 83%
33 Improvement to Roadside Drains V Contract W4 (Buroh Dr) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 100%
34 Improvement to Roadside Drains V Contract W4 (Pioneer Road/Gul Lane) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 95%
35 Improvement to Roadside Drains V Contract W4 (Fishery Port/Jln Tepong 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 96%
36 Improvement to Roadside Drains V Contract W4 (Penjuru Lane & Penjuru Rd) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 76%
37 Improvement to Roadside Drains V Contract W4 (Lok Yang Way/Pioneer Road North) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 99%
38 Improvement to Roadside Drains V Contract W4 (Boon Lay Way) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 100%
39 Improvement to Roadside Drains V Contract W4 (Gul Road) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 62%
40 Improvement to Roadside Drains V Contract W4 (Yew Siang Rd) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 100%
41 Improvement to Roadside Drains V Contract W4 (Siok Wan Cl) 1170388 Quarter 3 - 2017 Quarter 4 - 2020 () 100%
42 New Drainage Infrastructure at Marina South 33160325 Quarter 4 - 2017 Quarter 4 - 2020 () 48%
43 Improvement to Roadside Drains V Contract E5 (Pasir Ris Outlet Drain) 1180028 Quarter 1 - 2018 Quarter 2 - 2021 () 1%
44 Improvement to Roadside Drains V Contract E5 (Jln Kembangan) 1180028 Quarter 1 - 2018 Quarter 2 - 2021 () 1%
45 Improvement to Roadside Drains V Contract E5 (Yishun Ave 1/ Yishun Ave 6) 1180028 Quarter 1 - 2018 Quarter 2 - 2021 () 1%
46 Improvement to Roadside Drains V Contract E5 (Pasir Ris Estate) 1180028 Quarter 1 - 2018 Quarter 2 - 2021 () 48%
47 Improvement to Roadside Drains V Contract E5 (Hai Sing Estate) 1180028 Quarter 1 - 2018 Quarter 2 - 2021 () 99%
48 Improvement to Roadside Drains V Contract C4 - Kampong Ampat 1180182 Quarter 2 - 2018 Quarter 2 - 2021 () 1%
49 Improvement to Roadside Drains V Contract C4 - Langsat Rd/Lr Changi 1180182 Quarter 2 - 2018 Quarter 2 - 2021 () 24%
50 Improvement to Roadside Drains V Contract C4 - Sennett Estate 1180182 Quarter 2 - 2018 Quarter 2 - 2021 () 23%
51 Improvement to Roadside Drains V Contract C4 - Thomson Rd 1180182 Quarter 2 - 2018 Quarter 2 - 2021 () 59%
52 Improvement to Alexandra Canal Subsidiary Drain "A" (Between Alexandra Road and Alexandra Canal) 1180191 Quarter 2 - 2018 Quarter 1 - 2021 () 35%
53 Improvement to Sungei Tampines (Tampines Ave 7 to Tampines Expressway) 1180229 Quarter 2 - 2018 Quarter 2 - 2021 () 34%
54 Improvement to Roadside Drains V Contract C5 - Stamford Rd/Hill Street 1180289 Quarter 3 - 2018 Quarter 4 - 2020 () 27%
55 Improvement to Roadside Drains V Contract C5 - Burghley Drive 1180289 Quarter 3 - 2017 Quarter 4 - 2020 () 100%
56 Improvement to Roadside Drains V Contract C5 - Upper Thomson Rd 1180289 Quarter 3 - 2018 Quarter 4 - 2020 () 98%
57 Improvement to Roadside Drains V Contract C5 - River Valley Rd/Delta Rd 1180289 Quarter 3 - 2018 Quarter 4 - 2020 () 27%
58 Improvement to Kallang Subsidiary Drain II (Between Jalan Keli and Sin Ming Road) 1180230 Quarter 2 - 2018 Quarter 4 - 2020 () 30%
59 Improvement to Opera Estate Outlet Drain (Between Marine Parade Road and Siglap Link) 1180414 Quarter 3 - 2018 Quarter 1 - 2021 () 14%
60 Improvement to Mandai Outlet Drain (Between Woodlands Road and Sungei Pang Sua) 1180413 Quarter 4 - 2018 Quarter 2 - 2020 () 28%
61 Improvement to Airport Road Outlet Drain (Between Tai Seng Avenue and Pelton Canal) 1180432 Quarter 4 - 2018 Quarter 2 - 2020 () 2%
62 Improvement to Mountbatten Road Outlet Drain (Between Stadium Boulevard and Geylang River) 1190010 Quarter 1 - 2019 Quarter 4 - 2020 () 5%
63 Improvement to Roadside Drains V Contract E6 (Upp Changi Road, Bedok North Ave 4, Changi South Lane) 1190085 Quarter 1 - 2019 Quarter 3 - 2022 () 1%
64 Improvement to Roadside Drains V Contract E6 (Hougang Ave 8) 1190085 Quarter 1 - 2019 Quarter 3 - 2022 () 1%
65 Improvement to Roadside Drains V Contract E6 (Jalan Tari Zapin) 1190085 Quarter 1 - 2019 Quarter 3 - 2022 () 1%
66 Improvement to Roadside Drains V Contract E6 (Marine Parade Road) 1190085 Quarter 1 - 2019 Quarter 3 - 2022 () 1%
67 Improvement to Roadside Drains V Contract E6 (Jalan Legundi to Sembawang Road) 1190085 Quarter 1 - 2019 Quarter 3 - 2022 () 21%
68 Improvement to Roadside Drains V Contract E6 (Jalan Tanjong) 1190085 Quarter 1 - 2019 Quarter 3 - 2022 () 17%
69 Improvement to Bukit Timah Canal (between Rifle Range Road and Jalan Kampong Chantek) 1190115 Quarter 1 - 2019 Quarter 2 - 2023 () 2%

Drainage (in conjunction with Estate upgrading programme by MND)


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 2 - Merbok... 1180415A Quarter 4 - 2018 Quarter 2 - 2021 () 20%
2 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 2 - Toh Tu... 1180415A Quarter 4 - 2018 Quarter 2 - 2021 () 50%
3 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 3 -Sea Bre... 1190003A Quarter 1 - 2019 Quarter 3 - 2021 () 17%
4 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 3 - Spring... 1190003A Quarter 1 - 2019 Quarter 3 - 2021 () 17%
5 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 1 -Thomson... 1190009A Quarter 1 - 2019 Quarter 3 - 2021 () 10%
6 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 1 - Clover... 1190009A Quarter 1 - 2019 Quarter 3 - 2021 () 14%
7 Improvement to Roadside Drains under EUP Batch 9 Contract 5 - Lentor Estate 1190062 Quarter 1 - 2019 Quarter 1 - 2021 () 14%
8 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 4 - Toh an... 1190111 Quarter 1 - 2019 Quarter 3 - 2021 () 3%
9 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 4 - Jalan ... 1190111 Quarter 1 - 2019 Quarter 3 - 2021 () 1%
10 Improvement to Roadside Drains and Watermain Replacement Works under EUP Batch 9 Contract 4 - Tanah ... 1190111 Quarter 1 - 2019 Quarter 3 - 2021 () 1%

Sewerage (new sewer and sewer rehabilitation)


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 Proposed Sewers in Marina Central Area - Contract 1 1140327 Quarter 3 - 2014 Quarter 4 - 2018 () 59%
2 Proposed Sewers in Mandai Road Area 1140436 Quarter 3 - 2014 Quarter 3 - 2019 () 81%
3 Proposed Sewers in Yishun Avenue 7 Area 1140547 Quarter 4 - 2014 Quarter 3 - 2019 () 87%
4 Proposed Sewers In Sembawang Road and Sembawang Avenue Areas 1140613 Quarter 4 - 2014 Quarter 4 - 2019 Ms Aderline Tay(90920156) 75%
5 Proposed Sewer in Cairnhill and Newton Circus Areas 1150138 Quarter 1 - 2015 Quarter 4 - 2019 Mr Roni Haarman(96773788) 92%
6 Proposed Sewers in Ang Mo Kio Avenue 5 Area 1140483 Quarter 3 - 2014 Quarter 4 - 2018 () 74%
7 Sewerage Scheme to serve Marina South Area - Contract 2B (along Union Street) 1130074 Quarter 1 - 2013 Quarter 1 - 2017 () 55%
8 Proposed Sewers in Changi East Area - Package A Contract 1 (Balance Works) 1160358 Quarter 3 - 2016 Quarter 2 - 2019 () 49%
9 Proposed Sewers in Sungei Tengah Agrotechnology Park Area (Package A) 1160224 Quarter 2 - 2016 Quarter 3 - 2019 () 85%
10 Proposed Sewers in Sungei Tengah Agrotechnology Park Area (Package A) 1160224 Quarter 1 - 2016 Quarter 3 - 2019 () 85%
11 Proposed Sewers in Lorong Chuan and Lim Tua Tow Areas 1160206 Quarter 2 - 2016 Quarter 1 - 2019 Kimmy Tan Kim Guat(97112912) 52%
12 Proposed Sewers in Lorong Chuan and Lim Tua Tow Areas 1160206 Quarter 2 - 2016 Quarter 1 - 2019 Kimmy Tan Kim Guat(97112912) 52%
13 Sewerage Scheme to Serve Jurong Eastern Catchment (Package D) - Demolition of Pumping Stations 1160245 Quarter 2 - 2016 Quarter 1 - 2020 Nirmaladevi.V(Devi)(95970428) 51%
14 Sewerage Scheme to Serve Jurong Eastern Catchment (Package D) - Demolition of Pumping Stations 1160245 Quarter 2 - 2016 Quarter 1 - 2020 Nirmaladevi.V(Devi)(95970428) 51%
15 Proposed Sewers in Bukit Batok East Ave 3 Area 1160293 Quarter 3 - 2016 Quarter 2 - 2020 () 79%
16 Proposed Sewers in North Woodlands Area (Package A) - Contract 1 1160257 Quarter 2 - 2016 Quarter 3 - 2019 Noor Mohmmed Bin Yusoff Ali(91415768) 78%
17 Proposed Sewers in North Woodlands Area (Package B) – Contract 1 1160247 Quarter 2 - 2016 Quarter 3 - 2019 Long Philip Andrew(94361027) 81%
18 Proposed Sewers In Toh Tuck Avenue Area 1170110 Quarter 1 - 2017 Quarter 3 - 2021 Ms Truya Marijoy Millones(82579355) 38%
19 PROPOSED SEWERS IN LIM CHU KANG AREA - CONTRACT 1 1170224 Quarter 2 - 2017 Quarter 1 - 2020 () 67%
20 Proposed Sewers in Sungei Tengah Agrotechnology Park Area (Package B) 1170002 Quarter 1 - 2017 Quarter 4 - 2019 Tay Ern Chai(92452704) 77%
21 PROPOSED SEWERS IN SUNGEI TENGAH AGROTECHNOLOGY PARK AREA (PACKAGE C) 1170231 Quarter 1 - 2017 Quarter 1 - 2020 () 61%
22 Proposed Sewers in Lim Chu Kang Area - Contract 2 1170393 Quarter 3 - 2017 Quarter 2 - 2020 Ms Doris Bay(96491763) 74%
23 Sewerage Scheme to Serve Marina South Area – Contract 2 (Balance Works) 1170312 Quarter 2 - 2017 Quarter 1 - 2019 () 37%
24 Sewerage Scheme to Serve Marina South Area – Contract 2 (Balance Works) 1170312 Quarter 2 - 2017 Quarter 1 - 2019 () 37%
25 Proposed Sewers in New Loyang Link And Tanah Merah Besar Road Areas 1170374 Quarter 3 - 2017 Quarter 1 - 2020 Quek Er Kee() 83%
26 PROPOSED SEWERS IN EBER ROAD, PATERSON HILL AND PASIR 1170280 Quarter 2 - 2017 Quarter 1 - 2020 Roni Haarman Sari(96773788) 68%
27 PROPOSED SEWERS IN EBER ROAD, PATERSON HILL AND PASIR 1170280 Quarter 2 - 2017 Quarter 1 - 2020 Roni Haarman Sari(96773788) 68%
28 PROPOSED SEWERS IN EBER ROAD, PATERSON HILL AND PASIR 1170280 Quarter 2 - 2017 Quarter 1 - 2020 Roni Haarman Sari(96773788) 68%
29 SEWERAGE SCHEME TO SERVE PULAU PUNGGOL BARAT CONTRACT 1 – PROPOSED SEWERS AND PUMPING MAINS ALONG SE... 1170516 Quarter 4 - 2017 Quarter 1 - 2020 () 55%
30 Proposed Sewers In Ulu Pandan ,Pandan Valley And Mount Sinai Rise Areas (Pandan Valley And Mount Sin... 1170479 Quarter 4 - 2017 Quarter 3 - 2020 Ms Ju Jue(90105320) 30%
31 Proposed Sewers In Ulu Pandan ,Pandan Valley And Mount Sinai Rise Areas (Ulu Pandan) 1170479 Quarter 4 - 2017 Quarter 3 - 2020 Ms Ju Jue(90105320) 30%
32 PROPOSED SEWERS IN BUANGKOK GREEN AND SENGKANG EAST AREAS 1170518 Quarter 4 - 2017 Quarter 1 - 2021 () 25%
33 Proposed Sewers in Lim Chu Kang Area – Contract 3 1170560 Quarter 4 - 2017 Quarter 3 - 2020 Lee Wen Ting(93397617) 80%
34 Proposed Sewers in Stevens Road and Merpati Road Areas (Stevens Road) 1180011 Quarter 4 - 2017 Quarter 1 - 2021 Ms Kimmy Tan(84983249) 0%
35 Proposed Sewers in Stevens Road and Merpati Road Areas (Merpati Road) 1180011 Quarter 4 - 2017 Quarter 1 - 2021 Ms Kimmy Tan(84983249) 0%
36 Proposed Sewers in Lim Chu Kang Area – Contract 4 1180065 Quarter 2 - 2018 Quarter 4 - 2020 Ivy Goh(97337155) 29%
37 P5NRC1 - Rehabilitation of Sewerage Network Phase 5 – Northern Region Contract 1 1170453 Quarter 3 - 2017 Quarter 4 - 2019 Joey Keuek Chin Yee(83282588) 74%
38 P5NRC2 - Rehabilitation of Sewerage Network Phase 5 – Northern Region Contract 2 1170466 Quarter 3 - 2017 Quarter 4 - 2019 Lim Lee Noi Lilian(98420643) 82%
39 Proposed Sewers in Upper Changi Road East Area – Contract 2 1170230 Quarter 2 - 2017 Quarter 3 - 2020 Nisa Razak(98246167) 50%
40 Proposed Sewers in Upper Changi Road East Area – Contract 2 1170230 Quarter 2 - 2017 Quarter 3 - 2020 Nisa Razak(98246167) 50%
41 Proposed Sewers in Upper Changi Road East Area – Contract 2 1170230 Quarter 2 - 2017 Quarter 3 - 2020 Nisa Razak(98246167) 50%
42 Proposed Sewers in Punggol Road and Sengkang East Areas – Contract 1 (Sengkang East Area) 1180129 Quarter 1 - 2018 Quarter 2 - 2021 Ms Ong Sher Ting, Jace(92308169) 27%
43 Proposed Sewers in Punggol Road and Sengkang East Areas – Contract 1 (Punggol Road Area) 1180129 Quarter 1 - 2018 Quarter 2 - 2021 Ms Ong Sher Ting, Jace(92308169) 25%
44 SEWERAGE SCHEME TO SERVE PULAU PUNGGOL BARAT CONTRACT 2 - PROPOSED PUMPING MAINS ALONG SELETAR NORTH... 1180186 Quarter 2 - 2018 Quarter 3 - 2020 () 0%
45 Proposed Sewers in Lim Chu Kang Area – Contract 5 1180237 Quarter 3 - 2018 Quarter 2 - 2021 Ong Sher Ting, Jace(92308169) 15%
46 Proposed Sewers along Thomson-East Coast Line and North-South Expressway – Contract 1 1180233 Quarter 2 - 2018 Quarter 2 - 2021 Thu Zar Lwin() 18%
47 Proposed Sewers along Thomson-East Coast Line and North-South Expressway – Contract 1 1180233 Quarter 2 - 2018 Quarter 2 - 2021 Thu Zar Lwin() 18%
48 Proposed Sewers along Thomson-East Coast Line and North-South Expressway – Contract 1 1180233 Quarter 2 - 2018 Quarter 2 - 2021 Thu Zar Lwin() 18%
49 Proposed Sewers along Thomson-East Coast Line and North-South Expressway – Contract 1 1180233 Quarter 2 - 2018 Quarter 2 - 2021 Thu Zar Lwin() 18%
50 Proposed Sewers in East Coast Road and Mountbatten Road 1180234 Quarter 2 - 2018 Quarter 4 - 2020 Ms Lilian Lim(9842 0643) 0%
51 Proposed Sewers in East Coast Road and Mountbatten Road 1180234 Quarter 2 - 2018 Quarter 4 - 2020 Ms Lilian Lim(9842 0643) 0%
52 Proposed Sewers in Punggol North Area - Contract 2 1180218 Quarter 2 - 2018 Quarter 3 - 2021 Charmaine Fong(97711844) 27%
53 Proposed Sewers in North Woodlands Area (Package A) – Contract 2 1180280 Quarter 3 - 2018 Quarter 4 - 2021 Long Phillip Andrew(9436 1027) 16%
54 Proposed Sewers in Yuan Ching Road Area 1180475 Quarter 4 - 2018 Quarter 3 - 2020 Annia Layar(96504070) 38%
55 PROPOSED SEWERS IN TANAH MERAH COAST ROAD AREA 1180453 Quarter 4 - 2018 Quarter 4 - 2021 Ong Chiew Yeah(87122152) 0%
56 Proposed Sewers In Punggol North Area – Contract 1 1180145 Quarter 1 - 2018 Quarter 1 - 2021 Pwae Wa Aung Aung(97323914) 25%
57 Proposed Sewers in Siglap road, Upper East Coast Road, Towner Road and Woodsville Close Areas (Woods... 1180451 Quarter 4 - 2018 Quarter 3 - 2021 Steven Lim(83384376) 0%
58 Proposed Sewers in Siglap road, Upper East Coast Road, Towner Road and Woodsville Close Areas (Upper... 1180451 Quarter 4 - 2018 Quarter 3 - 2021 Steven Lim(83384376) 0%
59 Proposed Sewers in Siglap road, Upper East Coast Road, Towner Road and Woodsville Close Areas (Towne... 1180451 Quarter 4 - 2018 Quarter 3 - 2021 Steven Lim(83384376) 0%
60 Proposed Sewers in Siglap road, Upper East Coast Road, Towner Road and Woodsville Close Areas (Sigla... 1180451 Quarter 4 - 2018 Quarter 3 - 2021 Steven Lim(83384376) 0%
61 Proposed Sewers in Loyang Way and Pasir Ris Drive 3 Areas 1190101 Quarter 1 - 2019 Quarter 1 - 2022 Pyae Wa Aung Aung() 0%
62 Proposed Sewers In North Woodlands Area (Package B) - Contract 3 1190034 Quarter 1 - 2019 Quarter 1 - 2022 Megawati(9615 6352) 0%
63 Proposed Sewers In North Woodlands Area (Package B) – Contract 2 1190206 Quarter 2 - 2019 Quarter 2 - 2022 () 0%
64 Replacement of M&E Equipment at North Buona Vista Lift Station 1190320 Quarter 3 - 2019 Quarter 3 - 2021 () 0%
65 SR CCTV - Rehabilitation of Sewerage Network Phase 5 Colour Closed-Circuit Television (CCTV) Survey ... 1180303 Quarter 3 - 2018 Quarter 4 - 2019 Lawrence Soh(92715961) 82%
66 ERC1 - Rehabilitation of Sewerage Network Phase 5 - Eastern Region Contract 1 (Big Diameter 600 - 1700mm) 1180318 Quarter 3 - 2018 Quarter 3 - 2020 Dhivya(93837606) 36%
67 ERC2 - Rehabilitation of Sewerage Network Phase 5 - Eastern Region Contract 2 1180344 Quarter 3 - 2018 Quarter 3 - 2020 Mark Lee(98755361) 51%
68 DLP CCTV Southern - Rehabilitation of Sewerage Network Phase 4 - Colour Closed-Circuit Television (C... 1180350 Quarter 3 - 2018 Quarter 4 - 2020 Adha(92472611) 83%
69 ERC3 - Rehabilitation of Sewerage Network Phase 5 - Eastern Region Contract 3 1180349 Quarter 3 - 2018 Quarter 3 - 2020 Syafi(98315361) 54%
70 DLP Western & Marina - Rehabilitation of Sewerage Network Phase 4 - Colour Closed-Circuit Television... 1180378 Quarter 3 - 2018 Quarter 4 - 2019 Max(82994817) 92%
71 Proposed Sewers in Punggol Road and Sengkang East Areas - Contract 2 (Punggol Road) 1190304 Quarter 3 - 2019 Quarter 4 - 2022 Mary Zakhour(90250940) 0%
72 Proposed Sewers in Punggol Road and Sengkang East Areas - Contract 2 (Rivervale Drive) 1190304 Quarter 3 - 2019 Quarter 4 - 2022 Mary Zakhour(90250940) 0%
73 Proposed Sewers in Punggol Road and Sengkang East Areas - Contract 2 (Anchorvale Street) 1190304 Quarter 3 - 2019 Quarter 4 - 2022 Mary Zakhour(90250940) 0%
74 P5SRC1 - Rehabilitation of Sewerage Network Phase 5 – Southern Region Contract 1 1190358 Quarter 3 - 2019 Quarter 4 - 2021 Syafi’i(98315361) 0%

Water Supply (NEWater, potable water)


S.No Project Title Contract No Start Date End Date PRO Details % Completed
1 SUPPLY, LAYING AND INSTALLATION OF 1600MM / 1200MM DIAMETER POTABLE WATER PIPELINE ALONG ANG MO KIO ... 1150175 Quarter 3 - 2015 Quarter 2 - 2020 () 96%
2 SUPPLY, LAYING AND INSTALLATION OF 1600MM DIAMETER POTABLE WATER PIPELINE FROM PUNGGOL WAY TO PUNGGO... 1150235 Quarter 3 - 2015 Quarter 3 - 2019 () 98%
3 Proposed 2200mm diameter pipeline from PIE/Rifle Range Road to Tanglin Halt Road 1160148 Quarter 2 - 2016 Quarter 1 - 2020 Tee Wee Lee(88180561) 83%
4 SUPPLY AND LAYING OF 1600MM DIAMETER WATER PIPELINE ALONG LORONG CHUAN AND BOUNDARY ROAD 1150239 Quarter 2 - 2015 Quarter 2 - 2020 Ted Ling Feng(87837001) 73%
5 Proposed 2200mm Diameter Pipeline from Tanglin Halt Road to AYE/Henderson Road 1160274 Quarter 2 - 2016 Quarter 2 - 2019 Ms Serena Tang(98330407) 99%
6 Proposed Twin 1600mm Diameter Pipeline from AYE/Henderson Road to Keppel Road and 1600mm Diameter Pi... 1160279 Quarter 2 - 2016 Quarter 2 - 2020 Mr. Alan Tan(91191183) 72%
7 Laying of 1600mm Diameter Pipeline from AYE/Henderson Road to River Valley Road... 1160263 Quarter 3 - 2016 Quarter 3 - 2020 Salina Kamsan(97716896) 53%
8 Proposed 2200mm diameter pipeline from Murnane Service Reservoir (MNSR) at Jalan Kampong Chantek to ... 1160396 Quarter 3 - 2016 Quarter 1 - 2021 S R Divina(98702664) 46%
9 Proposed 800mm diameter pipelines from Pioneer Road to Tuas South Avenue 5 and along Tuas South Boul... 1160330 Quarter 4 - 2016 Quarter 3 - 2019 Shane Shi(96546461) 99%
10 Supply and Laying of 1200mm Diameter Water Pipeline along Clementi Road and West Coast Highway 1160514 Quarter 1 - 2017 Quarter 3 - 2018 Sapumal(84934801) 80%
11 Proposed 900 dia. potable water pipelines along proposed realigned Punggol Road and two future roads... 1190229 Quarter 4 - 2017 Quarter 4 - 2019 Ong Mei Han(96635217) 82%
12 Supply and Laying of 900mm/1200mm/1400mm dia Water Pipelines in Bukit Kalang Service Reservoir 1170096 Quarter 1 - 2017 Quarter 4 - 2019 () 95%
13 Laying of 1600/1200mm dia PW Pipeline along Elias Road and Tampines Ave 6 1170310 Quarter 3 - 2017 Quarter 1 - 2020 Nadia Hassan (Ms)(97385434) 69%
14 Supply, Laying and Installation of 1600/800mm Dai Potable Water Pipelines in Marina South 1170515 Quarter 2 - 2018 Quarter 4 - 2019 () 97%
15 Supply, Laying and Installation of 1200 mm dia Potable Water Pipeline from Marina East Desalination ... 1160412 Quarter 3 - 2016 Quarter 2 - 2021 Liu Wenxin(81625957) 25%
16 Proposed 1200mm diameter pipeline from proposed Jurong Island desalination plant (JIDP) to existing ... 1190080 Quarter 1 - 2019 Quarter 2 - 2020 () 41%
17 Tengah Pipeline Phase A1 1190229 Quarter 4 - 2019 Quarter 4 - 2020 Keith Ong(91847013) 0%
18 Proposed 1200mm dia Water Pipeline along Punggol East from Punggol Field to TPE 1190322 Quarter 3 - 2019 Quarter 1 - 2021 () 0%
19 Proposed 800mm/1200mm Diameter Water Pipeline along Sengkang West Road from Tampines Expressway to Y... 1190020 Quarter 1 - 2019 Quarter 1 - 2021 Ong Mei Han(96635217) 22%